top of page

Bathroom Renovation in Orpington

Orpington sits at the southern edge of our service area, and it is one of the busiest areas we work in. The town and its surrounding neighbourhoods — Locksbottom, Green Street Green, Farnborough — have a high concentration of 1960s and 1970s family homes, many of which still have their original bathroom layouts. These are exactly the properties where a well-planned renovation makes the most immediate difference.

We are a short drive away and carry out work in Orpington regularly. Lee attends every initial site survey in person, assesses the space properly, and provides a fixed-price quote before any work begins. There are no estimates revised upwards after the job starts.

The postcode area BR5 and BR6 covers a broad range of property sizes, from compact semi-detached homes in St Paul's Cray to substantial detached properties on the fringes of the Green Belt. We work across all of them.

orpington bathroom brushed brass shower

Services in Orpington

Bespoke bathroom renovation

Full design and installation — family bathrooms, luxury en-suites, and modern wet rooms. Projects range from a single bathroom refurbishment to a whole-house plumbing and bathroom overhaul. Every quote is fixed-price and issued after a free site survey.

Plumbing and heating

New boiler installations, underfloor heating, radiator upgrades, and emergency repairs. We carry out both planned maintenance and urgent call-outs across the Orpington area.

Wet rooms

Orpington's post-war housing stock often has bathroom layouts that lend themselves well to a wet room conversion — no bath, no shower tray, a fully tanked and waterproofed space. We design and install these properly, with the drainage and tanking done to the standard that makes them last.

Our Five-Step Process

A typical bathroom fit takes 10 to 14 working days.

01

Initial Design Meeting

Understanding how you use the space and what the renovation needs to achieve.

02

Space Planning

Detailed measurements and a full assessment of the existing plumbing.

03

Project Estimate

Fixed-price quote, every cost itemised, nothing left open.

04

Full Fitting

Removal, plumbing, electrics, tanking, tiling, cabinetry, and all finishing work.

05

Room Handover

A walk-through together to confirm everything meets the standard agreed.

Frequently Asked Questions

We have a 1970s house where the bathroom and separate toilet were built as two very small rooms. Can you combine them into one?

Yes, and this is one of the most common projects we carry out in Orpington. Removing the dividing wall between a bathroom and a separate WC creates a much more functional space, and it is straightforward in properties of this era provided the soil stack and waste runs can be re-routed — which we assess at the site survey. We will tell you clearly what is achievable before any commitment is made.

How far do you travel within the Orpington area?

We cover the full BR5 and BR6 postcode area, including Locksbottom, Green Street Green, Farnborough, Petts Wood, and St Mary Cray. For properties at the outer edges — towards Biggin Hill or Chelsfield — call us on 07854 889819 and we will confirm coverage before booking a survey.

Do you handle the removal and disposal of the old bathroom?

Yes, completely. Strip-out and disposal of the existing suite, tiles, and materials is included as part of every renovation project. We remove it all, leave a clean site at the end of each day, and manage all waste disposal.

Request Your Free Site Survey

Lee will visit your Orpington property, assess the space, and provide a clear fixed-price quote — no obligation.

The Bathroom Project | 07854 889819 | lee@thebathroomproject.co Mon–Fri 07:00–18:00 | Sat 10:00–16:00 | Sun by appointment

bottom of page